Translate the approved supply plan into realistic shop-floor schedules that respect real machine limits, shifts and material availability.

Orders across mixing, filling, packing and palletizing are laid out against real line capacity, with changeovers hatched in and due dates marked.
MRP spots that Resin A is short by 4,200 kg, shows which orders it blocks and how the delay ripples down the lines — three orders would ship late.
The scheduler weighs 18 sequences against lateness, changeovers and material cost, applies the best one and releases the schedule, with before and after side by side.
Use the menu on the left, or the tabs below — every screen is a page of the product, with sample data.






Capacity & Gantt. The Gantt and the AI scheduler re-sequencing around a shortage.Orders. Every production order with its line, dates and status.Changeovers. The best of 18 sequences, with the changeovers it saves line by line.BOM & MRP. Materials exploded against the schedule, with open purchase orders and coverage.Shortages. A material shortage found early, with the orders it would hit.Suppliers. Supplier performance behind every material, so the risky ones stand out.
Orders, line data and figures on these screens are sample data to show the idea.